Introduction
Córas Iompair Éireann (CIÉ), in exercise of its powers conferred upon it by Section 37 of the Transport (Railway Infrastructure) Act 2001, as amended by the Planning and Development (Strategic Infrastructure) Act 2006, is applying to An Bord Pleanála for a Railway Order pursuant to the provisions of the said Act. The DART Underground will expand and connect both intercity and commuter rail services. The Railway Order Application will be available for public inspection from 7th July 2010.
The order, if granted, will authorise CIÉ to construct, maintain, improve and operate an underground electrified heavy railway, and the railway works specified in the Railway Order or any part thereof. The DART Underground will involve construction and operation of approximately 8.6km of new rail from the CIÉ Inchicore Works to tie into the Northern Mainline south of East Wall Road, north of the Docklands area. The DART Underground consists of approximately 7.6km of twin tunnel between the portals at East Wall and Inchicore.
Newspaper Notice
Draft Railway Order
Railway Works Drawings
- Area 101
- 01 RO Cover Sheets
- 02 RO Property Details
- 03 RO Alignment Details
- 04 RO Structures Details
- DU-BU 101 A-B 01.PDF
- DU-BU 101 A-B 02.PDF
- DU-ES 101 B-C 01.PDF
- DU-ES 101 B-C 02.PDF
- DU-ES 101 B-C 03.PDF
- DU-ES 101 B-C 04.PDF
- DU-IS 101 C-D 11.PDF
- DU-IS 101 C-D 12.PDF
- DU-IS 101 C-D 13.PDF
- DU-IS 101 C-D 14.PDF
- DU-RW 101 C-O 06.pdf
- DU-RW 101 C-O 07.pdf
- DU-ST 101 A-C 01.PDF
- DU-ST 101 A-C 02.PDF
- DU-ST 101 A-C 03.PDF
- DU-ST 101 A-C 04.PDF
- DU-ST 101 A-C 05.PDF
- DU-ST 101 A-C 06.PDF
- Area 102
- 01 RO Cover Sheets
- 02 RO Property Details
- 03 RO Alignment Details
- 04 RO Structures Details
- DU-IS 102 O-A 01.PDF
- DU-IS 102 O-A 02.PDF
- DU-IS 102 O-A 03.pdf
- DU-IS 102 O-A 04.pdf
- DU-IS 102 O-A 05.pdf
- DU-ST 102 C-O 01.PDF
- DU-ST 102 C-O 02.pdf
- DU-ST 102 C-O 03.pdf
- DU-ST 102 C-O 04.PDF
- DU-ST 102 C-O 05.PDF
- DU-ST 102 C-O 06.pdf
- DU-ST 102 C-O 07.pdf
- DU-ST 102 C-O 08.PDF
- DU-ST 102 C-O 09.PDF
- DU-ST 102 C-O 10.PDF
- DU-ST 102 C-O 11.PDF
- DU-ST 102 C-O 12.pdf
- DU-ST 102 C-O 13.PDF
- DU-ST 102 C-O 14.pdf
- DU-ST 102 C-O 15.pdf
- Area 103
- 01 RO Cover Sheets
- 02 RO Property Details
- 03 RO Alignment Details
- 04 RO Structures Details
- Area 104
- 01 RO Cover Sheets
- 02 RO Property Details
- 03 RO Alignment Details
- 04 RO Structures Details
- Area 105
- 01 RO Cover Sheets
- 02 RO Property Details
- 03 RO Alignment Details
- 04 RO Structures Details
- Area 106
- 01 RO Cover Sheets
- 02 RO Property Details
- 03 RO Alignment Details
- 04 RO Structures Details
- DU-ES 106 C-O 02.PDF
- DU-FB 106 B-C 01.PDF
- DU-MC 106 A-B 11.PDF
- DU-MC 106 A-B 12.PDF
- DU-MC 106 A-B 13.PDF
- DU-MC 106 A-B 14.PDF
- DU-MC 106 A-B 15.PDF
- DU-MC 106 A-B 16.PDF
- DU-MC 106 A-B 17.PDF
- DU-OC 106 B-O 11.pdf
- DU-OC 106 B-O 12.pdf
- DU-OC 106 B-O 13.PDF
- DU-OC 106 B-O 14.PDF
- DU-RB 106 C-O 01.PDF
- DU-ST 106 O-A 01.PDF
- DU-ST 106 O-A 02.PDF
- DU-ST 106 O-A 03.PDF
- DU-ST 106 O-A 04.PDF
- DU-ST 106 O-A 05.PDF
- DU-ST 106 O-A 06.PDF
- DU-ST 106 O-A 07.PDF
- DU-ST 106 O-A 08.PDF
- DU-ST 106 O-A 09.PDF
- DU-ST 106 O-A 10.PDF
- DU-ST 106 O-A 11.PDF
- DU-ST 106 O-A 12.PDF
Book of Reference to the Plan (Schedules)
- 1 First Schedule (Website).pdf
- 2 Second Schedule (Website).pdf
- 3 Third Schedule (Website).pdf
- 4 Fourth Schedule (Website).pdf
- 5 Fifth Schedule (Website).pdf
- 6 Sixth Schedule (Website).pdf
- 7 Seventh Schedule (Website).pdf
- 8 Eighth Schedule (Website).pdf
- 9 Ninth Schedule (Website).pdf
- 10 Tenth Schedule (Website).pdf
- 11 Eleventh Schedule (Website).pdf
- 12 Twelfth Schedule (Website).pdf
Environmental Impact Statement
- Vol 1 - Non Technical Summary
- 1.Volume 1 (NTS).pdf
- Figure NTS 01.pdf
- Figure NTS 02 (Rev 1).pdf
- Figure NTS 03 (Rev 1).pdf
- Figure NTS 04 (Rev 1).pdf
- Figure NTS 05 (Rev 1).pdf
- Figure NTS 06 (Rev 1).pdf
- Figure NTS 07 (Rev 1).pdf
- Figure NTS 08.pdf
- Figure NTS 09.pdf
- Figure NTS 10.pdf
- Figure NTS 11.pdf
- Figure NTS 12.pdf
- Figure NTS 13.pdf
- Figure NTS 14.pdf
- Figure NTS 15.pdf
- Vol 2 - Main EIS Report
- Vol 3 - EIS Figures
- Vol 3 Book 1 Chapters 1-4
- Book1of4 Cover.pdf
- Book1of4 Preface.pdf
- Book1of4 TOC.pdf
- Figure 01-000 X-Interleave.pdf
- Figure 01-001.pdf
- Figure 01-002.pdf
- Figure 02-000 X-Interleave.pdf
- Figure 02-001.pdf
- Figure 02-002.pdf
- Figure 02-003.pdf
- Figure 02-004.pdf
- Figure 02-005.pdf
- Figure 02-006.pdf
- Figure 02-007.pdf
- Figure 02-008.pdf
- Figure 02-009.pdf
- Figure 02-010.pdf
- Figure 02-011.pdf
- Figure 02-012.pdf
- Figure 02-013.pdf
- Figure 02-014.pdf
- Figure 02-015.pdf
- Figure 02-016.pdf
- Figure 02-017.pdf
- Figure 02-018.pdf
- Figure 02-019.pdf
- Figure 02-020.pdf
- Figure 02-021.pdf
- Figure 02-022.pdf
- Figure 02-023.pdf
- Figure 02-024.pdf
- Figure 02-025.pdf
- Figure 02-026.pdf
- Figure 02-027.pdf
- Figure 02-028.pdf
- Figure 02-029.pdf
- Figure 02-030.pdf
- Figure 02-031.pdf
- Figure 02-032.pdf
- Figure 02-033.pdf
- Figure 02-034.pdf
- Figure 02-035.pdf
- Figure 02-036.pdf
- Figure 02-037.pdf
- Figure 02-038.pdf
- Figure 02-039.pdf
- Figure 02-040.pdf
- Figure 02-041.pdf
- Figure 02-042.pdf
- Figure 02-043.pdf
- Figure 02-044.pdf
- Figure 02-045.pdf
- Figure 02-046.pdf
- Figure 02-047.pdf
- Figure 02-048.pdf
- Figure 02-049.pdf
- Figure 02-050.pdf
- Figure 02-051.pdf
- Figure 02-052.pdf
- Figure 02-053.pdf
- Figure 02-054.pdf
- Figure 02-055.pdf
- Figure 02-056.pdf
- Figure 02-057.pdf
- Figure 02-058.pdf
- Figure 02-059.pdf
- Figure 02-060.pdf
- Figure 02-061.pdf
- Figure 02-062.pdf
- Figure 02-063.pdf
- Figure 02-064.pdf
- Figure 02-065.pdf
- Figure 02-066.pdf
- Figure 02-067.pdf
- Figure 02-068.pdf
- Figure 02-069.pdf
- Figure 02-070.pdf
- Figure 02-071.pdf
- Figure 02-072.pdf
- Figure 02-073.pdf
- Figure 02-074.pdf
- Figure 02-075.pdf
- Figure 03-000 X-Interleave.pdf
- Figure 03-001.pdf
- Figure 03-002.pdf
- Figure 03-003.pdf
- Figure 03-004.pdf
- Figure 03-005.pdf
- Figure 03-006.pdf
- Figure 03-007.pdf
- Figure 03-008.pdf
- Figure 03-009.pdf
- Figure 03-010.pdf
- Figure 03-011.pdf
- Figure 03-012.pdf
- Figure 03-013.pdf
- Figure 03-014.pdf
- Figure 03-015.pdf
- Figure 03-016.pdf
- Figure 03-017.pdf
- Figure 03-018.pdf
- Figure 03-019.pdf
- Figure 03-020.pdf
- Figure 03-021.pdf
- Figure 03-022.pdf
- Figure 03-023.pdf
- Figure 03-024.pdf
- Figure 03-025.pdf
- Figure 03-026.pdf
- Figure 03-027.pdf
- Figure 03-028.pdf
- Figure 03-029.pdf
- Figure 03-030.pdf
- Figure 03-031.pdf
- Figure 03-032.pdf
- Figure 03-033.pdf
- Figure 03-034.pdf
- Figure 03-035.pdf
- Figure 03-036.pdf
- Figure 03-037.pdf
- Figure 03-038.pdf
- Figure 03-039.pdf
- Figure 03-040.pdf
- Figure 03-041.pdf
- Figure 03-042.pdf
- Figure 03-043.pdf
- Figure 03-044.pdf
- Figure 03-045.pdf
- Figure 03-046.pdf
- Figure 03-047.pdf
- Figure 03-048.pdf
- Figure 03-049.pdf
- Figure 03-050.pdf
- Figure 03-051.pdf
- Figure 03-052.pdf
- Figure 03-053.pdf
- Figure 03-054.pdf
- Figure 03-055.pdf
- Figure 03-056.pdf
- Figure 03-057.pdf
- Figure 03-058.pdf
- Figure 03-059.pdf
- Figure 03-060.pdf
- Figure 03-061.pdf
- Figure 03-062.pdf
- Figure 03-063.pdf
- Figure 03-064.pdf
- Figure 03-065.pdf
- Figure 03-066.pdf
- Figure 03-067.pdf
- Figure 03-068.pdf
- Figure 03-069.pdf
- Figure 03-070.pdf
- Figure 03-071.pdf
- Figure 03-072.pdf
- Figure 03-073.pdf
- Figure 03-074.pdf
- Figure 03-075.pdf
- Figure 03-076.pdf
- Figure 03-077.pdf
- Figure 04-000 X-Interleave.pdf
- Figure 04-001.pdf
- Vol 3 Book 2 Chapters 5-10
- Book2of4 Cover.pdf
- Book2of4 Preface.pdf
- Book2of4 TOC.pdf
- Figure 05-000 X-Interleave.pdf
- Figure 05-001.pdf
- Figure 05-002.pdf
- Figure 05-003.pdf
- Figure 05-004.pdf
- Figure 05-005.pdf
- Figure 05-006.pdf
- Figure 05-007.pdf
- Figure 05-008.pdf
- Figure 05-009.pdf
- Figure 05-010.pdf
- Figure 05-011.pdf
- Figure 05-012.pdf
- Figure 05-013.pdf
- Figure 05-014.pdf
- Figure 05-015.pdf
- Figure 05-016.pdf
- Figure 05-017.pdf
- Figure 05-018.pdf
- Figure 05-019.pdf
- Figure 05-020.pdf
- Figure 05-021.pdf
- Figure 05-022.pdf
- Figure 05-023.pdf
- Figure 05-024.pdf
- Figure 05-025.pdf
- Figure 05-026.pdf
- Figure 05-027.pdf
- Figure 05-028.pdf
- Figure 05-029.pdf
- Figure 05-030.pdf
- Figure 05-031.pdf
- Figure 05-032.pdf
- Figure 05-033.pdf
- Figure 05-034.pdf
- Figure 05-035.pdf
- Figure 05-036.pdf
- Figure 05-037.pdf
- Figure 06-000 X-Interleave.pdf
- Figure 06-001.pdf
- Figure 06-002.pdf
- Figure 06-003.pdf
- Figure 06-004.pdf
- Figure 06-005.pdf
- Figure 06-006.pdf
- Figure 06-007.pdf
- Figure 06-008.pdf
- Figure 06-009.pdf
- Figure 06-010.pdf
- Figure 06-011.pdf
- Figure 06-012.pdf
- Figure 06-013.pdf
- Figure 06-014.pdf
- Figure 06-015.pdf
- Figure 06-016.pdf
- Figure 06-017.pdf
- Figure 06-018.pdf
- Figure 06-019.pdf
- Figure 06-020.pdf
- Figure 06-021.pdf
- Figure 06-022.pdf
- Figure 06-023.pdf
- Figure 06-024.pdf
- Figure 06-025.pdf
- Figure 06-026.pdf
- Figure 06-027.pdf
- Figure 06-028.pdf
- Figure 06-029.pdf
- Figure 06-030.pdf
- Figure 06-031.pdf
- Figure 06-032.pdf
- Figure 06-033.pdf
- Figure 06-034.pdf
- Figure 06-035.pdf
- Figure 06-036.pdf
- Figure 06-037.pdf
- Figure 06-038.pdf
- Figure 06-039.pdf
- Figure 06-040.pdf
- Figure 06-041.pdf
- Figure 06-042.pdf
- Figure 06-043.pdf
- Figure 06-044.pdf
- Figure 06-045.pdf
- Figure 06-046.pdf
- Figure 06-047.pdf
- Figure 06-048.pdf
- Figure 06-049.pdf
- Figure 06-050.pdf
- Figure 06-051.pdf
- Figure 06-052.pdf
- Figure 06-053.pdf
- Figure 06-054.pdf
- Figure 06-055.pdf
- Figure 06-056.pdf
- Figure 06-057.pdf
- Figure 06-058.pdf
- Figure 06-059.pdf
- Figure 06-060.pdf
- Figure 06-061.pdf
- Figure 06-062.pdf
- Figure 06-063.pdf
- Figure 06-064.pdf
- Figure 06-065.pdf
- Figure 06-066.pdf
- Figure 06-067.pdf
- Figure 06-068.pdf
- Figure 06-069.pdf
- Figure 06-070.pdf
- Figure 06-071.pdf
- Figure 06-072.pdf
- Figure 06-073.pdf
- Figure 06-074.pdf
- Figure 06-075.pdf
- Figure 06-076.pdf
- Figure 06-077.pdf
- Figure 06-078.pdf
- Figure 06-079.pdf
- Figure 06-080.pdf
- Figure 06-081.pdf
- Figure 06-082.pdf
- Figure 06-083.pdf
- Figure 06-084.pdf
- Figure 06-085.pdf
- Figure 06-086.pdf
- Figure 06-087.pdf
- Figure 06-088.pdf
- Figure 06-089.pdf
- Figure 06-090.pdf
- Figure 06-091.pdf
- Figure 06-092.pdf
- Figure 06-093.pdf
- Figure 07-000 X-Interleave.pdf
- Figure 07-001.pdf
- Figure 07-002.pdf
- Figure 07-003.pdf
- Figure 07-004.pdf
- Figure 07-005.pdf
- Figure 07-006.pdf
- Figure 07-007.pdf
- Figure 07-008.pdf
- Figure 07-009.pdf
- Figure 07-010.pdf
- Figure 07-011.pdf
- Figure 07-012.pdf
- Figure 07-013.pdf
- Figure 07-014.pdf
- Figure 07-015.pdf
- Figure 07-016.pdf
- Figure 07-017.pdf
- Figure 07-018.pdf
- Figure 07-019.pdf
- Figure 07-020.pdf
- Figure 07-021.pdf
- Figure 07-022.pdf
- Figure 07-023.pdf
- Figure 07-024.pdf
- Figure 07-025.pdf
- Figure 07-026.pdf
- Figure 07-027.pdf
- Figure 07-028.pdf
- Figure 07-029.pdf
- Figure 07-030.pdf
- Figure 07-031.pdf
- Figure 07-032.pdf
- Figure 07-033.pdf
- Figure 07-034.pdf
- Figure 07-035.pdf
- Figure 07-036.pdf
- Figure 07-037.pdf
- Figure 07-038.pdf
- Figure 07-039.pdf
- Figure 07-040.pdf
- Figure 07-041.pdf
- Figure 07-042.pdf
- Figure 07-043.pdf
- Figure 07-044.pdf
- Figure 07-045.pdf
- Figure 07-046.pdf
- Figure 07-047.pdf
- Figure 07-048.pdf
- Figure 07-049.pdf
- Figure 07-050.pdf
- Figure 07-051.pdf
- Figure 07-052.pdf
- Figure 07-053.pdf
- Figure 07-054.pdf
- Figure 07-055.pdf
- Figure 07-056.pdf
- Figure 07-057.pdf
- Figure 07-058.pdf
- Figure 07-059.pdf
- Figure 07-060.pdf
- Figure 07-061.pdf
- Figure 07-062.pdf
- Figure 07-063.pdf
- Figure 07-064.pdf
- Figure 07-065.pdf
- Figure 07-066.pdf
- Figure 07-067.pdf
- Figure 07-068.pdf
- Figure 07-069.pdf
- Figure 07-070.pdf
- Figure 07-071.pdf
- Figure 07-072.pdf
- Figure 07-073.pdf
- Figure 07-074.pdf
- Figure 07-075.pdf
- Figure 07-076.pdf
- Figure 07-077.pdf
- Figure 07-078.pdf
- Figure 07-079.pdf
- Figure 07-080.pdf
- Figure 07-081.pdf
- Figure 07-082.pdf
- Figure 07-083.pdf
- Figure 07-084.pdf
- Figure 07-085.pdf
- Figure 07-086.pdf
- Figure 07-087.pdf
- Figure 07-088.pdf
- Figure 07-089.pdf
- Figure 07-090.pdf
- Figure 07-091.pdf
- Figure 07-092.pdf
- Figure 07-093.pdf
- Figure 07-094.pdf
- Figure 07-095.pdf
- Figure 07-096.pdf
- Figure 07-097.pdf
- Figure 07-098.pdf
- Figure 07-099.pdf
- Figure 07-100.pdf
- Figure 07-101.pdf
- Figure 07-102.pdf
- Figure 07-103.pdf
- Figure 07-104.pdf
- Figure 07-105.pdf
- Figure 07-106.pdf
- Figure 07-107.pdf
- Figure 07-108.pdf
- Figure 07-109.pdf
- Figure 07-110.pdf
- Figure 07-111.pdf
- Figure 07-112.pdf
- Figure 07-113.pdf
- Figure 07-114.pdf
- Figure 07-115.pdf
- Figure 07-116.pdf
- Figure 07-117.pdf
- Figure 07-118.pdf
- Figure 07-119.pdf
- Figure 07-120.pdf
- Figure 07-121.pdf
- Figure 07-122.pdf
- Figure 07-123.pdf
- Figure 07-124.pdf
- Figure 07-125.pdf
- Figure 07-126.pdf
- Figure 07-127.pdf
- Figure 07-128.pdf
- Figure 07-129.pdf
- Figure 08-000 X-Interleave.pdf
- Figure 08-001.pdf
- Figure 08-002.pdf
- Figure 08-003.pdf
- Figure 08-004.pdf
- Figure 08-005.pdf
- Figure 08-006.pdf
- Figure 08-007.pdf
- Figure 08-008.pdf
- Figure 08-009.pdf
- Figure 08-010.pdf
- Figure 08-011.pdf
- Figure 08-012.pdf
- Figure 08-013.pdf
- Figure 08-014.pdf
- Figure 08-015.pdf
- Figure 08-016.pdf
- Figure 08-017.pdf
- Figure 08-018.pdf
- Figure 09-000 X-Interleave.pdf
- Figure 09-001.pdf
- Figure 09-002.pdf
- Figure 09-003.pdf
- Figure 09-004.pdf
- Figure 09-005.pdf
- Figure 09-006.pdf
- Figure 09-007.pdf
- Figure 09-008.pdf
- Figure 09-009.pdf
- Figure 09-010.pdf
- Figure 09-011.pdf
- Figure 09-012.pdf
- Figure 09-013.pdf
- Figure 09-014.pdf
- Figure 09-015.pdf
- Figure 09-016.pdf
- Figure 09-017.pdf
- Figure 09-018.pdf
- Figure 09-019.pdf
- Figure 10-000 X-Interleave.pdf
- Figure 10-001.pdf
- Figure 10-002.pdf
- Figure 10-003.pdf
- Figure 10-004.pdf
- Figure 10-005.pdf
- Figure 10-006.pdf
- Vol 3 Book 3 Chapters 11-19
- Book3of4 Cover.pdf
- Book3of4 Preface.pdf
- Book3of4 TOC.pdf
- Figure 11-000 X-Interleave.pdf
- Figure 11-001.pdf
- Figure 12-000 X-Interleave.pdf
- Figure 12-001.pdf
- Figure 12-002.pdf
- Figure 12-003.pdf
- Figure 12-004.pdf
- Figure 12-005.pdf
- Figure 12-006.pdf
- Figure 13-000 X-Interleave.pdf
- Figure 13-001.pdf
- Figure 13-002.pdf
- Figure 13-003.pdf
- Figure 13-004.pdf
- Figure 13-005.pdf
- Figure 13-006.pdf
- Figure 13-007.pdf
- Figure 13-008.pdf
- Figure 13-009.pdf
- Figure 13-010.pdf
- Figure 13-011.pdf
- Figure 13-012.pdf
- Figure 13-013.pdf
- Figure 13-014.pdf
- Figure 13-015.pdf
- Figure 13-016.pdf
- Figure 13-017.pdf
- Figure 13-018.pdf
- Figure 13-019.pdf
- Figure 13-020.pdf
- Figure 13-021.pdf
- Figure 13-022.pdf
- Figure 13-023.pdf
- Figure 13-024.pdf
- Figure 13-025.pdf
- Figure 13-026.pdf
- Figure 13-027.pdf
- Figure 13-028.pdf
- Figure 13-029.pdf
- Figure 13-030.pdf
- Figure 13-031.pdf
- Figure 13-032.pdf
- Figure 13-033.pdf
- Figure 13-034.pdf
- Figure 13-035.pdf
- Figure 13-036.pdf
- Figure 14-000 X-Interleave.pdf
- Figure 14-001.pdf
- Figure 14-002.pdf
- Figure 14-003.pdf
- Figure 14-004.pdf
- Figure 14-005.pdf
- Figure 14-006.pdf
- Figure 14-007.pdf
- Figure 14-008.pdf
- Figure 14-009.pdf
- Figure 14-010.pdf
- Figure 14-011.pdf
- Figure 14-012.pdf
- Figure 14-013.pdf
- Figure 14-014.pdf
- Figure 14-015.pdf
- Figure 14-016.pdf
- Figure 14-017.pdf
- Figure 14-018.pdf
- Figure 15-000 X-Interleave.pdf
- Figure 15-001.pdf
- Figure 15-002.pdf
- Figure 15-003.pdf
- Figure 15-004.pdf
- Figure 16-000 X-Interleave.pdf
- Figure 16-001.pdf
- Figure 16-002.pdf
- Figure 16-003.pdf
- Figure 16-004.pdf
- Figure 16-005.pdf
- Figure 16-006.pdf
- Figure 16-007.pdf
- Figure 16-008.pdf
- Figure 16-009.pdf
- Figure 16-010.pdf
- Figure 16-011.pdf
- Figure 16-012.pdf
- Figure 16-013.pdf
- Figure 16-014.pdf
- Figure 16-015.pdf
- Figure 16-016.pdf
- Figure 16-017.pdf
- Figure 16-018.pdf
- Figure 16-019.pdf
- Figure 16-020.pdf
- Figure 17-000 X-Interleave.pdf
- Figure 17-001.pdf
- Figure 17-002.pdf
- Figure 17-003.pdf
- Figure 17-004.pdf
- Figure 17-005.pdf
- Figure 17-006.pdf
- Figure 17-007.pdf
- Figure 17-008.pdf
- Figure 17-009.pdf
- Figure 17-010.pdf
- Figure 17-011.pdf
- Figure 17-012.pdf
- Figure 17-013.pdf
- Figure 17-014.pdf
- Figure 17-015.pdf
- Figure 17-016.pdf
- Figure 17-017.pdf
- Figure 17-018.pdf
- Figure 17-019.pdf
- Figure 17-020.pdf
- Figure 17-021.pdf
- Figure 18-000 X-Interleave.pdf
- Figure 18-001.pdf
- Figure 19-000 X-Interleave.pdf
- Figure 19-001a.pdf
- Figure 19-001b.pdf
- Figure 19-001c.pdf
- Figure 19-001d.pdf
- Figure 19-001e.pdf
- Figure 19-001f.pdf
- Figure 19-001g.pdf
- Figure 19-001h.pdf
- Figure 19-001i.pdf
- Figure 19-001j.pdf
- Figure 19-001k.pdf
- Figure 19-001l.pdf
- Figure 19-001m.pdf
- Figure 19-001n.pdf
- Figure 19-001o.pdf
- Figure 19-002a-d.pdf
- Figure 19-003a-e.pdf
- Figure 19-003f.pdf
- Figure 19-004a-f.pdf
- Figure 19-004g-h.pdf
- Figure 19-005a-e.pdf
- Figure 19-006a-f.pdf
- Figure 19-006g-j.pdf
- Figure 19-006j.pdf
- Figure 19-006k.pdf
- Figure 19-007a-f.pdf
- Figure 19-007g.pdf
- Figure 19-007h.pdf
- Figure 19-007i.pdf
- Figure 19-007j.pdf
- Figure 19-007k-l.pdf
- Figure 19-008a-c.pdf
- Figure 19-008d-e.pdf
- Figure 19-009a-f.pdf
- Figure 19-010a-f.pdf
- Figure 19-010g-h.pdf
- Figure 19-011a-c.pdf
- Figure 19-011d-f.pdf
- Figure 19-012.pdf
- Figure 19-013.pdf
- Figure 19-014.pdf
- Figure 19-015.pdf
- Figure 19-016.pdf
- Figure 19-017.pdf
- Figure 19-018.pdf
- Figure 19-019.pdf
- Figure 19-020.pdf
- Figure 19-021.pdf
- Figure 19-022.pdf
- Figure 19-023.pdf
- Figure 19-024.pdf
- Figure 19-025.pdf
- Figure 19-026.pdf
- Figure 19-027.pdf
- Figure 19-028.pdf
- Figure 19-029.pdf
- Figure 19-030.pdf
- Figure 19-031.pdf
- Figure 19-032.pdf
- Figure 19-033.pdf
- Figure 19-034.pdf
- Figure 19-035.pdf
- Figure 19-036.pdf
- Figure 19-037.pdf
- Figure 19-038.pdf
- Figure 19-039.pdf
- Figure 19-040.pdf
- Figure 19-041.pdf
- Figure 19-042.pdf
- Figure 19-043.pdf
- Figure 19-044.pdf
- Figure 19-045.pdf
- Figure 19-046.pdf
- Figure 19-047.pdf
- Figure 19-048.pdf
- Figure 19-049.pdf
- Figure 19-050.pdf
- Figure 19-051.pdf
- Figure 19-052.pdf
- Figure 19-053.pdf
- Figure 19-054.pdf
- Vol 3 Book 4 Chapters 20-25
- Book4of4 Cover.pdf
- Book4of4 Preface.pdf
- Book4of4 TOC.pdf
- Figure 20-000 X-Interleave.pdf
- Figure 20-001.pdf
- Figure 20-002.pdf
- Figure 20-003.pdf
- Figure 20-004.pdf
- Figure 20-005.pdf
- Figure 20-006.pdf
- Figure 20-007.pdf
- Figure 20-008.pdf
- Figure 20-009.pdf
- Figure 20-010.pdf
- Figure 20-011.pdf
- Figure 20-012.pdf
- Figure 20-013.pdf
- Figure 20-014.pdf
- Figure 20-015.pdf
- Figure 20-016.pdf
- Figure 20-017.pdf
- Figure 20-018.pdf
- Figure 20-019.pdf
- Figure 20-020.pdf
- Figure 20-021.pdf
- Figure 20-022.pdf
- Figure 20-023.pdf
- Figure 20-024.pdf
- Figure 20-025.pdf
- Figure 20-026.pdf
- Figure 20-027.pdf
- Figure 20-028.pdf
- Figure 20-029.pdf
- Figure 20-030.pdf
- Figure 20-031.pdf
- Figure 20-032.pdf
- Figure 20-033.pdf
- Figure 20-034.pdf
- Figure 20-035.pdf
- Figure 20-036.pdf
- Figure 20-037.pdf
- Figure 20-038.pdf
- Figure 20-039.pdf
- Figure 20-040.pdf
- Figure 20-041.pdf
- Figure 20-042.pdf
- Figure 20-043.pdf
- Figure 20-044.pdf
- Figure 20-045.pdf
- Figure 20-046.pdf
- Figure 20-047.pdf
- Figure 20-048.pdf
- Figure 20-049.pdf
- Figure 20-050.pdf
- Figure 20-051.pdf
- Figure 20-052.pdf
- Figure 20-053.pdf
- Figure 20-054.pdf
- Figure 20-055.pdf
- Figure 20-056.pdf
- Figure 20-057.pdf
- Figure 20-058.pdf
- Figure 20-059.pdf
- Figure 20-060.pdf
- Figure 20-061.pdf
- Figure 20-062.pdf
- Figure 20-063.pdf
- Figure 20-064.pdf
- Figure 20-065.pdf
- Figure 20-066.pdf
- Figure 20-067.pdf
- Figure 20-068.pdf
- Figure 20-069.pdf
- Figure 20-070.pdf
- Figure 20-071.pdf
- Figure 20-072.pdf
- Figure 20-073.pdf
- Figure 20-074.pdf
- Figure 20-075.pdf
- Figure 20-076.pdf
- Figure 20-077.pdf
- Figure 20-078.pdf
- Figure 20-079.pdf
- Figure 20-080.pdf
- Figure 20-081.pdf
- Figure 20-082.pdf
- Figure 20-083.pdf
- Figure 20-084.pdf
- Figure 20-085.pdf
- Figure 20-086.pdf
- Figure 20-087.pdf
- Figure 20-088.pdf
- Figure 20-089.pdf
- Figure 20-090.pdf
- Figure 20-091.pdf
- Figure 20-092.pdf
- Figure 20-093.pdf
- Figure 20-094.pdf
- Figure 20-095.pdf
- Figure 20-096.pdf
- Figure 20-097.pdf
- Figure 20-098.pdf
- Figure 20-099.pdf
- Figure 20-100.pdf
- Figure 20-101.pdf
- Figure 20-102.pdf
- Figure 20-103.pdf
- Figure 20-104.pdf
- Figure 20-105.pdf
- Figure 20-106.pdf
- Figure 20-107.pdf
- Figure 20-108.pdf
- Figure 20-109.pdf
- Figure 20-110.pdf
- Figure 20-111.pdf
- Figure 20-112.pdf
- Figure 20-113.pdf
- Figure 20-114.pdf
- Figure 20-115.pdf
- Figure 20-116.pdf
- Figure 20-117.pdf
- Figure 20-118.pdf
- Figure 20-119.pdf
- Figure 20-120.pdf
- Figure 20-121.pdf
- Figure 20-122.pdf
- Figure 20-123.pdf
- Figure 20-124.pdf
- Figure 20-125.pdf
- Figure 20-126.pdf
- Figure 20-127.pdf
- Figure 20-128.pdf
- Figure 20-129.pdf
- Figure 20-130.pdf
- Figure 20-131.pdf
- Figure 20-132.pdf
- Figure 20-133.pdf
- Figure 20-134.pdf
- Figure 20-135.pdf
- Figure 20-136.pdf
- Figure 20-137.pdf
- Figure 20-138.pdf
- Figure 20-139.pdf
- Figure 20-140.pdf
- Figure 20-141.pdf
- Figure 20-142.pdf
- Figure 20-143.pdf
- Figure 20-144.pdf
- Figure 20-145.pdf
- Figure 20-146.pdf
- Figure 20-147.pdf
- Figure 20-148.pdf
- Figure 20-149.pdf
- Figure 20-150.pdf
- Figure 20-151.pdf
- Figure 20-152.pdf
- Figure 20-153.pdf
- Figure 20-154.pdf
- Figure 20-155.pdf
- Figure 20-156.pdf
- Figure 20-157.pdf
- Figure 20-158.pdf
- Figure 20-159.pdf
- Figure 20-160.pdf
- Figure 20-161.pdf
- Figure 20-162.pdf
- Figure 20-163.pdf
- Figure 20-164.pdf
- Figure 20-165.pdf
- Figure 20-166.pdf
- Figure 20-167.pdf
- Figure 20-168.pdf
- Figure 20-169.pdf
- Figure 20-170.pdf
- Figure 20-171.pdf
- Figure 20-172.pdf
- Figure 20-173.pdf
- Figure 20-174.pdf
- Figure 20-175.pdf
- Figure 20-176.pdf
- Figure 20-177.pdf
- Figure 20-178.pdf
- Figure 20-179.pdf
- Figure 20-180.pdf
- Figure 20-181.pdf
- Figure 20-182.pdf
- Figure 20-183.pdf
- Figure 20-184.pdf
- Figure 20-185.pdf
- Figure 20-186.pdf
- Figure 20-187.pdf
- Figure 20-188.pdf
- Figure 20-189.pdf
- Figure 20-190.pdf
- Figure 20-191.pdf
- Figure 20-192.pdf
- Figure 20-193.pdf
- Figure 20-194.pdf
- Figure 20-195.pdf
- Figure 20-196.pdf
- Figure 20-197.pdf
- Figure 20-198.pdf
- Figure 20-199.pdf
- Figure 20-200.pdf
- Figure 20-201.pdf
- Figure 20-202.pdf
- Figure 20-203.pdf
- Figure 20-204.pdf
- Figure 20-205.pdf
- Figure 20-206.pdf
- Figure 20-207.pdf
- Figure 20-208.pdf
- Figure 20-209.pdf
- Figure 20-210.pdf
- Figure 20-211.pdf
- Figure 20-212.pdf
- Figure 20-213.pdf
- Figure 20-214.pdf
- Figure 20-215.pdf
- Figure 20-216.pdf
- Figure 20-217.pdf
- Figure 20-218.pdf
- Figure 20-219.pdf
- Figure 20-220.pdf
- Figure 20-221.pdf
- Figure 20-222.pdf
- Figure 20-223.pdf
- Figure 20-224.pdf
- Figure 20-225.pdf
- Figure 20-226.pdf
- Figure 20-227.pdf
- Figure 21-000 X-Interleave.pdf
- Figure 21-001.pdf
- Figure 21-003.pdf
- Figure 22-000 X-Interleave.pdf
- Figure 22-001.pdf
- Figure 23-000 X-Interleave.pdf
- Figure 23-001.pdf
- Figure 24-000 X-Interleave.pdf
- Figure 24-001.pdf
- Figure 24-002.pdf
- Figure 25-000 X-Interleave.pdf
- Figure 25-001.pdf
- Vol 3 Book 1 Chapters 1-4
- Vol 4 - Appendices
- 00 COvers and TOC
- 1 EISVol4 Part1 Cover.pdf
- 2 EISVol4 Part2 Cover.pdf
- 3 EISVol4 Part3 Cover.pdf
- 4 EISVol4 Part4 Cover.pdf
- 5 EISVol4 Part5 Cover.pdf
- 6 EISVol4 Part6 Cover.pdf
- 7 EISVol4 Part7 Cover.pdf
- 8 EISVol4 Part8 Cover.pdf
- 9 EISVol4 Part9 Cover.pdf
- 10 EISVol4 Part10 Cover.pdf
- EISVol4 Preface.pdf
- EISVol4 Table of Contents.pdf
- 01 Introduction
- 02 Background
- A2.1.pdf
- A2.2.pdf
- A2.3.pdf
- A2.4.pdf
- A2.5
- Volume 1 - Summary and Recommendations
- Volume 2 - Topographical Survey
- Volume 3 - Building, Structure and Monument Information
- Volume 4 - Preliminary Environmental Impact Assessment
- Volume 5 - Geotechnical
- Volume 6 - Alignment
- Volume 7 - Tunnels and Portals
- Volume 8 - Stations
- Volume 9 - Mechanical and Electrical Systems
- Volume 10 - Railway Systems and Rolling Stock
- Volume 11 - Safety and Evacuation Strategy
- Volume 12,13,14
- Volume 15 - Construction Strategy
- Volume 16 - Drawings
- A2.5 Vol 16.pdf
- A2.5 Vol 16 Section01.pdf
- A2.5 Vol 16 Section02.pdf
- A2.5 Vol 16 Section03.pdf
- A2.5 Vol 16 Section04.pdf
- A2.5 Vol 16 Section05.pdf
- A2.5 Vol 16 Section06.pdf
- A2.5 Vol 16 Section07.pdf
- A2.5 Vol 16 Section08.pdf
- A2.5 Vol 16 Section09.pdf
- A2.5 Vol 16 Section10.pdf
- A2.5 Vol 16 Section11.pdf
- A2.5 Vol 16 Section12.pdf
- A2.5 Vol 16 Section13.pdf
- A2.5 Vol 16 Section14.pdf
- A2.5 Vol 16 Section15.pdf
- A2.5 Vol 16 Section16.pdf
- A2.5 Vol 16 Section17.pdf
- A2.5 Vol 16 Section18.pdf
- A2.5 Vol 16 Section19.pdf
- A2.5 Vol 16 Section20.pdf
- A2.5 Vol 16 Section21.pdf
- A2.5 Vol 16 Section22.pdf
- A2.5 Vol 16 Section23.pdf
- A2.5 Vol 16 Section24.pdf
- A2.5 Vol 16 Section25.pdf
- A2.5 Vol 16 Section26.pdf
- A2.5 Vol 16 Section27.pdf
- A2.5 Vol 16 Section28.pdf
- Document Tree (Rev D) 14 06 10 Arup Modification.docx
- 03 Scheme Description
- 04 Planning and Policy
- 05 Construction Strategy
- 06 Traffic and Transportation
- 07 Landscape and Visual
- 08 N&V from Overground Works
- 09 N&V from Underground Works
- 10 Air Quality
- 11 Climate
- 12 Flora and Fauna
- 13 Soils and Geology
- A13.1
- A13.2
- A13.2.pdf
- Appendix 01 - Cable Percussive Logs
- Appendix 02 - Rotary Core Logs & Discontinuity Sheets
- Appendix 03 - Trial Pit Logs
- Appendix 04 - Window Samples
- Appendix 05 - Groundwater Readings and Sampling
- Appendix 06 - Permeabilty Tests
- Appendix 07 - Packer Tests
- Appendix 08 - Downhole Geophysics
- 13.2 Appx08 Section01.pdf
- 13.2 Appx08 Section02.pdf
- 13.2 Appx08 Section03.pdf
- 13.2 Appx08 Section04.pdf
- 13.2 Appx08 Section05.pdf
- 13.2 Appx08 Section06.pdf
- 13.2 Appx08 Section07.pdf
- 13.2 Appx08 Section08.pdf
- 13.2 Appx08 Section09.pdf
- 13.2 Appx08 Section10.pdf
- 13.2 Appx08 Section11.pdf
- 13.2 Appx08 Section12.pdf
- 13.2 Appx08 Section13.pdf
- 13.2 Appx08 Section14.pdf
- 13.2 Appx08 Section15.pdf
- 13.2 Appx08 Section16.pdf
- 13.2 Appx08 Section17.pdf
- 13.2 Appx08 Section18.pdf
- 13.2 Appx08 Section19.pdf
- 13.2 Appx08 Section20.pdf
- 13.2 Appx08 Section21.pdf
- 13.2 Appx08 Section22.pdf
- 13.2 Appx08 Section23.pdf
- 13.2 Appx08 Section24.pdf
- Appendix 09 - Surface Geophysics
- Appendix 10 - Topographic Survey Data
- Appendix 11 - Exploratory Hole Location Plans
- Appendix 12 - Digital Data
- Appendix 13 - Soil Laboratory Data
- Appendix 14 - Rock Laboratory Data
- Appendix 15 - Environmental Laboratory Data
- Appendix 16 - Rotary Core Photographs
- Appendix 17 - Trial Pit Photographs
- Appendix 18 - Condition Survey
- 13.2 Appx18 Section01.pdf
- 13.2 Appx18 Section02.pdf
- 13.2 Appx18 Section03.pdf
- 13.2 Appx18 Section04.pdf
- 13.2 Appx18 Section05.pdf
- 13.2 Appx18 Section06.pdf
- 13.2 Appx18 Section07.pdf
- 13.2 Appx18 Section08.pdf
- 13.2 Appx18 Section09.pdf
- 13.2 Appx18 Section10.pdf
- 13.2 Appx18 Section11.pdf
- 13.2 Appx18 Section12.pdf
- 13.2 Appx18 Section13.pdf
- 13.2 Appx18 Section14.pdf
- 13.2 Appx18 Section15.pdf
- 13.2 Appx18 Section16.pdf
- 13.2 Appx18 Section17.pdf
- 13.2 Appx18 Section18.pdf
- 13.2 Appx18 Section19.pdf
- 13.2 Appx18 Section20.pdf
- 13.2 Appx18 Section21.pdf
- 13.2 Appx18 Section22.pdf
- Appendix 19 - Pump Test
- 14 Hydrogeology
- 15 Hydrology
- 16 Settlement
- 17 Material Assets
- 18 Electromagnetic Compatibility
- 19 Archaeology and Cultural Heritage
- 20 Architectural Heritage
- 21 Waste and Resource Management
- 22 Socio-Economic
- 23 Human Health
- 24 Interaction of Effects
- 25 Summary of Mitigation and Residual Impacts
- 00 COvers and TOC
Unsolicited Further Information
Public Information Regarding Input to the Railway Order Process
Inspection of the Railway Order and Accompanying Documents
A copy of the Draft Railway Order and each document accompanying the application may be inspected during normal office or opening hours from Wednesday 7th of July 2010 for the duration of 6 weeks until the Wednesday 18th August 2010, as set out by the Newspaper Notice, at:
- An Bord Pleanála, 64 Marlborough Street, Dublin 1;
- Dublin City Council, Civic Offices, Wood Quay, Dublin 2;
- Heuston Station, Dublin 8;
- Pearse Station, Dublin 2; and
- CIE Inchicore Works (Inchicore Parade entrance, Dublin 8).
A copy of the Draft Railway Order and each document accompanying the application can also be downloaded from this webpage. Simply click on any of the links and follow the instructions.
Purchase of Documents
A copy of the Draft Railway Order and each document accompanying the application can be downloaded free of charge from this webpage. Simply click on any of the links above and follow the instructions.
Copies or extracts from the documents, including the Environmental Impact Statement and the Non-Technical Summary of the same, may be purchased on payment of a fee not exceeding the reasonable cost of making such copy or extract from DART Underground Office, Heuston Station, Dublin 8; An Bord Pleanála, 64 Marlborough Street, Dublin 1; and Dublin City Council, Civic Offices, Wood Quay, Dublin 8.
The cost of DART Underground documentation from Corás Iompair Éireann is as follows:
i. Environmental Impact Statement (All Volumes)
Paper Copy - €170; Electronic Copy(CD/DVD) - €5
ii. Environmental Impact Statement Non-Technical Summary (Volume 1)
Paper Copy - €5; Electronic Copy ((CD/DVD) – See (i) above
iii. Environmental Impact Statement Main EIS Report (Volume 2)
Paper Copy - €30; Electronic Copy (CD/DVD) – See (i) above
iv. Environmental Impact Statement EIS Figures (Volume 3)
Paper Copy - €70; Electronic Copy (CD/DVD) – See (i) above
v. Environmental Impact Statement EIS Appendices (Volume 4)
Paper Copy - €65; Electronic Copy (CD/DVD – See (i) above
vi. Plan of Proposed Railway Works (Single Drawing A0 size)
Paper Copy - €25, Electronic Copy (CD/DVD) - €5 (Full RO Drawing Set)
Costs for other copies or extracts from the documents will be provided upon request.
Written Submissions
Submissions or observations may be made only to An Bord Pleanála, 64 Marlborough Street, relating to:
i. the proposed railway order, and
ii. the likely effects on the environment of the proposed railway works.
Any submissions/observations must be accompanied by the appropriate fee of €50 (except for certain prescribed bodies). Such submissions/observations must also include the following information:
i. the name of the person making the submission or observation, the name of the person acting on his or her behalf, if any, and the address to which any correspondence relating to the application should be sent;
ii. the subject matter of the submission or observation; and
ii. the reasons, considerations and arguments on which the submission or observation is based, in full.
Any submissions or observations which do not comply with the above requirements cannot be considered by the Board.
Oral Hearing
An Bord Pleanála may, at its absolute discretion, hold an Oral Hearing in relation to the likely effects on the environment of the proposal.
Summary of An Bord Pleanála Adjudication Procedure
The Railway Order Application is made directly to An Bord Pleanála in accordance with the provision of the Transport (Railway Infrastructure) Act, 2001, as amended by the Planning and Development (Strategic Infrastructure) Act, 2006. The applicant has forwarded copies of the Railway Order application and the EIS to the Board and to the prescribed bodies specified in the relevant legislation.
Any person may make submissions to An Bord Pleanála in relation to the application, within a specified 6 week period. Dublin City Council officials are required to issuea report to An Bord Pleanála.
Before making its decision on the application for approval of DART Underground, An Bord Pleanála must consider the Railway Order Documentation (including this EIS) and any submission, observation or further information made to An Bord Pleanála. If, after consideration of all information, An Bord Pleanála is of the opinion that the Railway Order should be granted, it shall make an order authorising the applicant to construct, maintain, improve and operate the railway or the railway works specified in the order or any part thereof, in such manner and subject to such conditions, modifications, restrictions and requirements (and on such other terms) as An Bord Pleanála thinks proper and specifies in the order. An Bord Pleanála shall furnish the applicant with a copy of the order.
The Railway Order will come into operation upon the expiration of a further 8 week period.
Further Project Information
Further project information is available from DART Underground is available from
- Post: DART Underground Office, Heuston Station, Dublin 8;
- Telephone: 1890 200 500 (Locall number);
- Email: dartunderground@irishrail.ie.
The website www.irishrail.ie/dartunderground will continue to be updated during the Railway Order Application process.
It should be noted that submissions or objection on the DART Underground application should not be directed to Corás Iompair Éireann or Iarnród Éireann. All submissions or objections should be directed to An Bord Pleanála.
